Interstate 73 Southbound - Guilford County

12/21/08 photos taken by Alex Nitzman / Brent Ivy.

Future Interstate 73 South / Joseph Bryan Boulevard East
Leaving the signalized intersection with Regional Road north and Burgess Road south, Bryan Boulevard (Future Interstate 73) next meets Old Oak Ridge Road and Airport Parkway. Photos taken 12/21/08.
Ramps depart Bryan Boulevard east ahead for Airport Parkway south to Piedmont Triad International Airport's terminal and Old Oak Ridge Road as it enters from the northwest suburbs. Photo taken 12/21/08.
All traffic to the airport area departs in unison. Old Oak Ridge Road parallels Bryan Boulevard east along the airport perimeter to Future Interstate 840. Photo taken 12/21/08.
Eastbound Bryan Boulevard at the ramp partition to Airport Parkway south. Photos taken 12/21/08.
Future Interstate 74 draws to within one half mile of its southward turn onto Future Interstate 840. Presently the route is just signed as "To Interstate 40" for the connection three miles southward. Photo taken 12/21/08.
A directional-cloverleaf, partially open, joins Bryan Boulevard and Future Interstate 840. Interstate 73 begins and heads south to Interstate 40 & U.S. 421 and Painter Boulevard. Bryan Boulevard continues east one mile to Fleming Road and ultimately to Benjamin Parkway in central Greensboro. Photo taken 12/21/08.

Interstate 73 South & Future Interstate 840 West
First west/southbound reassurance markers for Interstate 73 & Future I-840 posted after the Bryan Boulevard interchange on the Greensboro Beltway south. A frontage road (Chimney Rock Road) parallels the freeway southward from Old Oak Ridge Road to Friendly Avenue. Photo taken by Jamie Dzencelowcz (02/23/08).
Midway between Bryan Boulevard and the merge with U.S. 421 is the Exit 2 diamond interchange with Friendly Avenue. Photo taken by Jamie Dzencelowcz (02/23/08).
Exit 2 departs Interstate 73 south & Future Interstate 840 west for Friendly Avenue. Friendly Avenue constitutes an east-west arterial from West Market Street near PTI Airport to West Market Street west of downtown Greensboro. Photo taken by Jamie Dzencelowcz (02/23/08).
Interstate 73 reduces to two through lanes for the continuation onto Painter Boulevard with U.S. 421 east. The right-hand lane defaults onto the directional ramps (Exit 1) for Interstate 40 west & U.S. 421 north to Winston Salem and Interstate 40 east to downtown Greensboro. Photo taken by Jamie Dzencelowcz (02/23/08).
Exit 1 widens to two lanes as it leaves Interstate 73 south at Future Interstate 840's west end. Interstate 73 joins U.S. 421 south on Painter Boulevard seven miles to junction Interstate 85 & U.S. 29-70. Photo taken by Jamie Dzencelowcz (02/23/08).
Exit 1 partitions into its respective ramps to Interstate 40 west and east. Interstate 40 & U.S. 421 travel six miles west to their split at the Winston-Salem Business Loop Interstate 40. Eastward the freeway continues seven miles to their merge with Business Loop Interstate 85 & U.S. 29-70-220 south of downtown. Photo taken by Jamie Dzencelowcz (02/23/08).
Interstate 73 & U.S. 421 South
Interstate 73 south leaves Future Interstate 840 for Painter Boulevard and approaches Exit 102 with Wendover Avenue. Wendover Avenue constitutes an east-west arterial from central Greensboro westward to North Carolina 68. Photo taken by Jamie Dzencelowcz (02/23/08).
U.S. 421 southbound traffic merges with Interstate 73 south as a six lane freeway. The six-ramp partial-cloverleaf interchange (Exit 102) with Wendover Avenue lies a short distance southward. Photo taken by Jamie Dzencelowcz (02/23/08).
Guilford College Road passes under Interstate 73 & U.S. 421 ahead of the Wendover Avenue off-ramp (Exit 102). Wendover Avenue meets Interstate 40 to the east before upgrading to a controlled-access expressway. Photo taken by Jamie Dzencelowcz (02/23/08).
"Reassurance shields" for Interstate 40 & 73, posted after Wendover Avenue; Interstate 40 & 73 shared pavement along Painter Boulevard between February and September of 2008. Bridford Parkway passes over Painter Boulevard in the distance. Photo taken by Jamie Dzencelowcz (02/23/08).
Interstate 73 & U.S. 421 south continue uninterrupted to junction Interstate 85, Business Loop Interstate 85, U.S. 29 & 70 (Exits 97A/B). Photo taken by Jamie Dzencelowcz (02/23/08).
A complex interchange joins Interstates 73 & U.S. 421 with Interstate 85 and Business Loop Interstate 85 & U.S. 29-70 at Exits 97A/B. Interstate 73 & U.S. 421 join Interstate 85 north briefly to Exit 122 along collector/distributor roadways. Business Loop Interstate 85 & U.S. 29-70 follow original Interstate 85 northeast toward central Greensboro. Interstate 85 & U.S. 29-70 south continue two miles to their split at Business Loop Interstate 85 south ahead of High Point. Photo taken by Jamie Dzencelowcz (02/23/08).
Exit 97A departs Interstate 73 & U.S. 421 south for Interstate 85 & U.S. 29 south and U.S. 70 west to High Point. U.S. 29 & 70 follow Business Loop Interstate 85 through High Point and Thomasville while Interstate 85 bypasses to the south en route to Saulsbury, Concord, and Charlotte. Photo taken by Jamie Dzencelowcz (02/23/08).
Exit 97B quickly follows for Business Loop Interstate 85 & U.S. 29 north and U.S. 70 east into Greensboro. The trio continue together six miles to Henry Boulevard in east Greensboro. Business Loop Interstate 85 combines with Interstate 40 for the return to Interstate 85 at Future Interstate 840. Photo taken by Jamie Dzencelowcz (02/23/08).
Continuing along Interstate 73 & U.S. 421 south, which follow the c/d roadways of Interstate 75 between Exits 97 and 122 to junction U.S. 220. Interstate 73 departs U.S. 421 south and Interstate 85 north via Exit 122 onto U.S. 220 south for Randleman and Asheboro. U.S. 421 continues along Interstate 85 north to its original alignment at Exit 126. Photo taken by Jamie Dzencelowcz (02/23/08).
Exit 118 consists of a three-quarter cloverleaf interchange between Interstates 73 & 85 and U.S. 220 & 421. Two of the eight movements are missing due to the nearby confluence of U.S. 220 with Business Loop Interstate 85 & U.S. 29-70. U.S. 220 continues from there with the trio eastward to Henry Boulevard. Southward, Future Interstate 73 follows U.S. 220 southward to Interstate 74 at Randleman and both highways to Ellerbe. Photo taken by Jamie Dzencelowcz (02/23/08).

See also Interstates 73-74 & U.S. 220 Southbound - Montgomery County